Q&A 1st PHASE



    Should we propose any connections to the rest of the Complex which will be designed? And if - in what way? [pedestrian connection? car connection?]
                                                                       Read More >>>
     

    What are the names of the roads localized next to the site? Do they have the same meaning? Is one of them more important [e.g. this which will connect to the Makkah road and then to the bridge?]
                                                                       Read More >>>
     

    Do the outside gardens have to be controlled by some special system? Or they can function by itself?
                                                                       Read More >>>
     

    Are there any types of materials that are impossible to use in Saudi Arabia/Jeddah?
                                                                       Read More >>>
     

    Wherefrom can we get the building laws for the Saudi Arabia /which include the basic measurements/?
                                                                       Read More >>>
     

    What is the common height of a surrounding buildings now? Are there any underground floor in the surrounding buildings? If there are -what is the maximum number?
                                                                       Read More >>>
     

    What scale of detail should be the drawings presented in phase one? Should the drawings reach the scale of 1:5? Is scale 1:200 enough for the first phase /for the concept/?
                                                                       Read More >>>
     

    Are there any water basins in Jeddah in a public space? How are they used?
                                                                       Read More >>>
     

    What is the maximum occupation for the site?
                                                                       Read More >>>
     

    We are not able to exactly distinguish the Unification Path and the Muslim Nations Path on the Mester Plan.
                                                                       Read More >>>
     

    What are the light brown lots shown on the periphery of the master plan prepared by the City. Future extension, residential, commercial,etc ?)
                                                                       Read More >>>
     

    Could we place the heliport on another location than the garage roof ?
                                                                       Read More >>>
     

    Will there be a Mascid within the building ?
                                                                       Read More >>>
     

    Is the area for prayer, located in the garden,outdoors (unconfined)? Is it the only prayer area of the whole project? Shouldn't there be prayer rooms or even a small mosque for this project?
                                                                       Read More >>>
     

    Since our ID code will be used for identification, what will the heading represent (is it a title for the project or else?)
                                                                       Read More >>>
     

    What do you mean for use floor surfaces? they are with or without corridors, stairs, elevators, bathrooms?
                                                                       Read More >>>
     

    Public Relations Facilities, 4 conference rooms for 100 people: Each room for 100 pers or total 100 persons. Pls, clarify.
                                                                       Read More >>>
     

    Are the subterrain structures, such as parking garage, counted towards land coverage area which is limited to 20.000 m2?
                                                                       Read More >>>
     

    Does recommendation that the building height of the office section be 24 floors reflect a requirement, in other words, is this a rather restrictive recommendation, or, is the number of floors flexible?
                                                                       Read More >>>
     

    Phase one Competition proposal materials - the five A3 drawings: Do these sheets need to be mounted/glued to boards or are they to be submitted rolled? If they need to be mounted how thick can the board be?
                                                                       Read More >>>
     

    Are Registration Forms and Phase One Competition proposal materials to be sent to the Competition Secretariat at the Istanbul address or to Jeddah?
                                                                       Read More >>>
     

    We would like to know the SWIFT CODE and IBAN numbers in order to pay registiration fee
                                                                       Read More >>>
     

    Should we stick on the plan which is presented in the slideshow?
                                                                       Read More >>>